 Project Scale: Building 50 MWp VINH hao 6 - Solar Power Plant.

Total Budget: 1400 Billion VND.

Client/Investor: Vinh Hao 6 - Power JSC

PTS Scope of Work:

PTS - EPC contractor for:

Survey, Design, supply materials, installation, commissioning and testing for Transmission line, 110KV substations, SCADA system- complying with unmanned substation requirements for Vinh Hao 6- Solar Power plant.